The El Camino Real Corridor Plan is a policy document that provides a comprehensive land use, transportation, and streetscape approach consistent with the General Plan’s principles. Establish metrics (as appropriate) to evaluate and iterate Plan implementation. Evaluate signal timing to improve traffic flow. Appendix D: El Camino Real Corridor Plan Existing Conditions Memo: Transportation (2016).Appendix C: El Camino Real Corridor Plan Existing Conditions Memo: Land Uses, Streetscape, & Public Realm (2016).Appendix B: Proposed Street Typology & Bicycle Backbone Network Figures, RWCmoves (draft plan October 2017).Appendix A: Existing Conditions Graphics (2018).Existing Conditions for the Study Segment (2018).Pop-Up Protected Bike Lane - Community Event Flyer and Event Photos AugComplete Streets Advisory Committee (status update & draft conceptual plans)īike & Ped Safety Improvement Study - Final Report.FebruCity Council (presentation on the conceptual design drawings and final report).MaPlanning Commission (presentation on the conceptual design drawings and final report).See the final report for more information about the study and next steps. Additional community feedback will be sought in future phases, however the study helps the City seek grant funding and identify next steps for making the vision become a reality. The yearlong study was completed in February of 2019, which resulted in conceptual design drawings for bike and pedestrian safety improvements on El Camino Real between Charter and Maple streets, including protected bike lanes, crosswalks, street crossings, and bus stops. Case study areas in Redwood City and Palo Alto were chosen based on their high opportunity to improve bicycle and pedestrian safety and access on El Camino Real. You can find out more through the study's Frequently Asked Questions. $350,000 in Caltrans grant funding for the development of a case study on behalf of the Grand Boulevard Initiative to develop 30% conceptual design drawings for pedestrian and bicycle safety improvements on El Camino Real (between Charter and Maple streets), building off of the approved El Camino Real Corridor Plan. Bike & Ped Safety Improvement Study: El Camino Real between Maple & Charter Streets The second phase of amendments includes updates to the Corridor zoning districts that addresses the community benefits program, activity centers, parking requirements, and neighborhood transitions. Opportunities for public input will be provided, including public hearings before the Planning Commission and City Council. Smoke-Free Ban For Multi-Family Housing FAQ.Additional Information - El Camino Real Cooridor Plan.Apply for a Permit & Status of Applications.Stanford in Redwood City Precise Plan EIR.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |